Keywords: Time, Cost, SDM, PERT Method, PDM, Microsoft Office Project 2003.Īuthors who publish with this journal agree to the following terms: Likely the project is completed on time / period of 317.13 days at 99% (on time). Period plus 3S (three times the standard deviation) is 303 days + 14.13 = 317.13 days, then it is Whereas if the duration / Project Completion On time / period of 303 days (normal time) only by 50%. The target analyte project completion time T (d), shows that the possibility of the project is completed Review Technique (PERT) Method and Presedence Diagram Method (PDM) with a software programĬompletion time planning the optimal project using PERT and PDM is 303 days with a The building project B FIA UB used a method, and the method used herein is Project Evaluation and To improve the quality of planning and control of With the number of activities that tend to increase. Project managers always want to find a method which can improve quality and control to deal MANAJEMEN WAKTU, BIAYA DAN SDM PROYEK KONSTRUKSIġ,2Jurusan Teknik Sipil Fakultas Teknik Universitas Muhammadiyah MalangĪlamat korespondensi : Jalan Raya Tlogomas 246 Malang 65144
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |